• Submit a Ticket
  • Web Store
  • Staff
Home How To How To: Install

CTs

    Please fill out the contact form below and we will reply as soon as possible.

    Sort By
    • Newest
    • Most likes
    • Most views
    • How To: Extend CT Leads

      Visit the online store page Model: Wago CT Extension Pack   The eGauge CT Extension Pack can be used to...

      November 11th, 2024 1444 views 0 likes

    • How To: Verify CT Phasing

      Overview The most common installation issue with retrofit energy metering is known as a phase mismatch, which will cause incorrect...

      November 11th, 2024 1540 views 1 likes

    • How To: Install split-core AC CTs

      Visit the online store page AC split-core CTs measures the amperage of a conductor on an AC (alternating current) system....

      December 4th, 2024 1995 views 0 likes

    • How To: Install eGauge DC CTs with CTid

      Visit the online store page Model: ESD-xxx-yyy eGauge DC CTs (model ESD-xxx-yyyy) measure the amperage on the conductor of a...

      December 9th, 2024 1338 views 0 likes

    • How To: Properly position Rope CTs

      Rope CTs should be installed properly to reduce the maximum error based on positioning. Ideally the conductor being monitored will...

      March 31st, 2025 1064 views 0 likes

    • How To: Install Rope CTs

      Visit the online store page eGauge rope CT with CTid   Rope CTs (technically called Rogowski Coils) are large, flexible...

      June 18th, 2025 787 views 0 likes

            ©2025 eGauge Systems. All Rights reserved.

            Knowledge Base Software by Helpjuice